Skip to content
Infrastructure · 2026

One-Time Improvement of Carriageway in Deoli Town with White Topping, NH-361

One-time improvement of the existing carriageway in Deoli Town with white topping (3.200 km) on the Yavatmal-Wardha section of NH-361, executed on EPC mode.

White topping highway improvement on NH-361 at Deoli Town, Yavatmal-Wardha section

Location

Deoli, Wardha-Yavatmal Section, Maharashtra

Completed

2026

Client

National Highways Authority Of India, Chandrapur

Overview

Project details

This NHAI project involved the one-time improvement of the existing carriageway passing through Deoli Town on the Yavatmal-Wardha section of NH-361. The work comprised laying rigid white topping (cement concrete pavement) over a 3.200 km stretch, strengthening the existing road structure to withstand heavy traffic loads and improve longevity. The project was executed on an Engineering, Procurement, and Construction (EPC) basis for the National Highways Authority of India, Chandrapur. White topping provides a durable, low-maintenance surface with superior riding quality and reflectivity, enhancing both safety and service life on this important state highway corridor.

Scope of Work

  • 3.200 km of white topping (rigid pavement) over existing carriageway
  • Pavement strengthening and surface preparation
  • Drainage and shoulder improvements through Deoli Town
  • Road markings, signage, and safety furniture
  • Traffic management during execution
Get Started

Let’s Build Something Great Together

From concept to handover, we deliver complex projects with the scale, discipline, and craft your vision deserves.