Mokhabardi Lift Irrigation Scheme
Construction of balance earthwork and CC lining for a 44.4 km main canal of the Mokhabardi Lift Irrigation Scheme.

Location
Bhiwapur, Nagpur, Maharashtra
Completed
Ongoing
Client
Ambhora Lift Irrigation Division, Bhiwapur
Project details
The Mokhabardi Lift Irrigation Scheme is a major water infrastructure project designed to bring irrigation to thousands of hectares of agricultural land in the Bhiwapur region. Our scope covers the balance earthwork excavation and cement concrete lining from RD 0 to 44,410 metres on the main canal. The concrete lining is critical for reducing seepage losses and ensuring efficient water conveyance to the command area. The project also includes construction of distribution structures, cross-drainage works, and canal regulatory structures.
Scope of Work
- 44.4 km main canal earthwork and lining
- Cement concrete lining for seepage control
- Cross-drainage and regulatory structures
- Distribution network connections
- Command area development
Let’s Build Something Great Together
From concept to handover, we deliver complex projects with the scale, discipline, and craft your vision deserves.